James River comprehensive report, Garrison Diversion Unit



Publisher: Dept. of the Interior, Bureau of Reclamation, Missouri-Souris Projects Office in Bismarck, N.D

Written in English
Published: Downloads: 117
Share This

Subjects:

  • Missouri River Basin Project (U.S.). -- Garrison Diversion Unit,
  • Irrigation -- Environmental aspects -- James River Watershed (N.D. and S.D.)
  • Edition Notes

    ContributionsUnited States. Bureau of Reclamation. Missouri-Souris Projects Office
    The Physical Object
    Pagination1 v. (various pagings) :
    ID Numbers
    Open LibraryOL14424485M

U.S. Fish and Wildlife Service. Baseline study of trace elements in the aquatic ecosystem of the James River, Garrison Diversion Unit, Technical Report. U.S. Fish and Wildlife Service, Bismarck, North Dakota, USA. U.S. Fish and Wildlife Service. Statement on environmental impact: Garrison diversion unit, Missouri River Basin project, North Dakota / ([Washington, D.C.]: The Bureau, [?]), by United States. Bureau of Reclamation (page images at HathiTrust) Report on replacement--lock & Mississippi River, Alton, Illinois. (St. report.” Secretary Sprynczynatyk presented for the Commission’s consideration the State Engineer’s request for funding from the Resources Trust Fund for the biennium. He explained that revenues into the Resources Trust Fund for the base budget request assumes that. Senate report on DAKOTA WATER RESOURCES ACT OF This report is by the Energy and Natural Resources may be intermittently unavailable between 10 p.m. Sat. 5/30 and 9 p.m. Sun. 5/31 due to scheduled maintenance.

In , Congress passed a River and Harbor Act that authorized the Corps to conduct surveys to formulate comprehensive water development plans in several river basins (because the provisions of the surveys were described in House Document No. , the surveys were known as the ‘ Reports’). James River Corporation was an American pulp and paper company based in Richmond, Virginia. It was once the largest paper manufacturer in the world.. History. The company was founded in as the James River Paper Company by Brenton Halsey and Robert Williams, with the purchase of Ethyl Corporation's Specialty Papers Division. Halsey and Williams were both former employees of . James River Communications is a leading solutions provider of advanced communication technologies specializing in voice, data and converged technologies providing a comprehensive array of products and services. Our expertise in traditional voice, converged communications, Voice over Internet Protocol (VoIP) solutions and data delivery allows us. But the state is still fighting for a Missouri River irrigation project - the Garrison Diversion. Garrison, a complex web of canals, dams, and lakes, was first authorized by Congress in

For example, if you would like to see any plans for the Klamath River in Oregon, please contact the Medford or Klamath Falls Offices of the Bureau of Land Management. Some of these plans may have been superceded by newer plans. We encourage you to check with the administering agency (e.g., the Bureau of Land Management in Montana for the Upper. USGS JAMES RIVER NEAR RICHMOND, VA. PROVISIONAL DATA SUBJECT TO REVISION. Available data for this site Click to hide station-specific text Station operated by the Virginia Department of Environmental Quality. river diversions, and indeed much is known from the myriad of studies over the past 30 years, some significant gaps in our understanding remain, perhaps most notably the overarching uncertainty in forcing landscape perturbations of the scale of large river diversions. Garrison Diversion is the state lead and co-partner on the Red River Valley Water Supply Project Environmental Impact Study (EIS). Garrison Diversion’s role will be to help determine the best way to meet the water supply needs and provide technical support for the Red River Valley.

James River comprehensive report, Garrison Diversion Unit Download PDF EPUB FB2

Additional Physical Format: Microfiche version: James River comprehensive report, Garrison Diversion Unit. Bismarck, N.D.: Dept. of the Interior, Bureau of. James River comprehensive report, Garrison Diversion Unit.

Bismarck, N.D.: Department of the Interior, Bureau of Reclamation, Missouri-Souris Projects Office, (OCoLC) Abstract "April "Shipping list no.: es bibliographical references (p. G-1 - G-3).Mode of access: Internet. THE JAMES RIVER IN SOUTH DAKOTA By Rick D.

Benson recommended major changes in the Garrison Diversion Unit (GDU) in North Dakota (Garrison Diversion Unit Commission, ). Onthe Garrison Reformulation Act directs the Secretary of Interior to submit a comprehensive report to the Congress as soon as practicable but not Author: R.D.

Benson. The Garrison Diversion James River comprehensive report District (Garrison Diversion) is committed to securing a stronger future by providing a reliable, high quality and affordable water supply to benefit the people of North Dakota.

Garrison Diversion represents the state in the state and local Red River Valley Water Supply Project, a project designed to bring. Garrison Diversion Unit of fish, fish eggs, fish larvae, The legislation addressed the James River by directing a comprehensive study of effects over the next any James River improvements could not be undertaken.

Of acre New Rockford Extension included in the Garrison Diversion Unit Commission final report. County and is a feature of the Garrison Diversion Unit. The Oakes test area consists of 5, acres of land originally designated for irrigation with Missouri River water prior to full-scale Garrison Diversion Project operation to allow study of return flow water quality.

Due to delays encountered with delivery of Missouri River water, the USBR. United States Department of Interior, Bureau of Reclamation, James River Comprehensive Report, Garrison Diversion Unit, (Missouri-Souris Projects Office, September ), S 2. United States Department of Interior, Bureau of Reclamation, Technical Record of Design and Construction, Jamestown Dam, (Denver: U.S.

Government Printing Office, ), 1; United States Department of. The State of the James is a report card summarizing ongoing efforts to bring the James River back to full health. This comprehensive assessment of the health of the river is published every two years.

The State of the James report is designed to examine the status and trends of indicators in two categories – River Health and River Restoration. - A special report on phase development of the Garrison Diversion Unit prepared by Bureau of Reclamation, calling for the initial development of 85, acres of irrigation, all within the Missouri River drainage basin.

Phase II, including the remainingirrigation acres of the authorized plan, would be added later. The close of marks the completion of James River Association’s 40th year of protecting America’s Founding River.

When we began as a small band of concerned neighbors inthe James River was in its worst health ever grabbing national headlines with toxic contamination from kepone and the entire tidal river being shut down to any kind of fishing.

The Garrison Diversion Unit (GDU) of the Pick-Sloan Missouri Basin program was authorized inwith the purpose of diverting Missouri River water to the James River for irrigation, municipal and industrial water supply, fish and wildlife habitat, recreation, and flood control.

The project was reauthorized inwith the specification that comprehensive studies be conducted to address a. TARGET RISK OVERVIEW: Environmental & Heavy Commercial Contractors, Project Management. Emergency Response; Remediation Contractors; Industrial Plant Repair & Maintenance.

Directs the Secretary to submit a comprehensive report to the Congress, not later than the end of FYon the effects on the James River in North Dakota and South Dakota of water resource development proposals recommended by the Garrison Diversion Unit Commission.

Prohibits specified construction projects prior to the submission of such report. Scope and Contents: The Garrison Diversion Unit Commission Records date from August-Decemberand have been divided into four series. Detailed Description Series 1: Reports Series 2: Business Meeting Minutes Series 3: Transcripts of Public Hearings Series 4: Transcripts of Proceedings.

"(f) In implementing the provisions of this Act, the Secretary is directed to construct all supply works to the capacity identified in the Garrison Diversion Unit Commission Final Report, except that the Secretary is directed to construct the James River Feeder Canal to a capacity of no more than cubic feet per second, and the Sykeston.

• Final Report on Water Quality Impacts Garrison Study Commission • James River Model Studies Garrison Diversion Unit, Pick-Sloan Missouri Basin Program August Box B • Garrison Extension Special Report, Bureau of Reclamation Upper Missouri Regional Office January • Lamoure-Oakes Section, and James River Water Quality Study.

The Collected material consists of city and county reports, researcher’s abstracts and publications, Environmental Protection Agency (EPA) material guides, Garrison Diversion Unit data, James River information, OAHE unit stages, city and county plans, along with the Clarifier and OpFlow publications.

Garrison Diversion Project Proposals. Background. Since the Garrison dam on the Missouri River in North Dakota was completed in the mids (creating a huge reservoir known as Lake Sakakawea/Lake Audubon) there have been a variety of proposed irrigation projects and water distribution proposals for municipal, rural and industrial uses.

Contact Title: Area Office Manager Organization: Dakotas Area Office Address: PO Box City: Bismarck, ND Fax: Phone: GARRISON DIVERSION UNIT COMMISSION For fiscal year the water and energy appro priations bill.

signed by the President on Julycontained an agreement to establish a commis sion to review the Garrison Diversion Unit. The Garrison Diversion Unit Commission was a 12member panel appointed by the Secretary of the. The earliest version of the Garrison Diversion Unit (GDU) was originally authorized by Congress in the Flood Control Act of Decem (58 Stat.).

Investigations conducted subsequent to revealed that major portions of the proposed project were impractical, and the project plans underwent substantial revision during the 's.

"(c)(1) The Secretary is directed to submit a comprehensive report to the Congress as soon as practicable, but not later than the end of fiscal year on the effects on the James River in North Dakota and South Dakota of water resource development proposals rec­ ommended by the Garrison Diversion Unit Commission and au­ thorized in this Act.

N.W.2d 82 () In the Matter of the Confirmation and Approval of the Master Contract between the GARRISON DIVERSION CONSERVANCY DISTRICT and the United States and of the Four Three-way Contracts among the Garrison Diversion Conservancy District, the United States, and respectively, the Dickey-Sargent, the Lincoln Valley, the Warwick-McVille and the James River Irrigation Districts.

Directs the Secretary to submit a comprehensive report to the Congress, not later than the end of FYon the effects on the James River in North Dakota and South Dakota of water resource development proposals recommended by the Garrison Diversion Unit Commission.

Prohibits specified construction projects prior to the submission of such report. Folder 1: Final Report of the Garrison Diversion Unit Commission, Decem Folder 2: Supplement to the Interim Staff Report on Issues and Alternatives, Novem Series 2: Business Meeting Minutes This series contains minutes of meetings held in Washington, D.C.

on Aug Octo and Novem Box 1. Finding Aid. Download Finding Aid and Container List. Collection Summary Identifier. MA Title. South Dakota Resources Coalition Records. Creator. South Dakota Resources Coalition, South Dakota Environmental Coalition.

• "Progress Report on the Geology and Ground-Water Hydrology of Part of the Oahe Unit, James River Division South Dakota," U.S. Department of the Interior Geological Survey Water Resources • "Report on Garrison Diversion Unit," Bureau of Reclamation Region 6, January Comprehensive Plan of Development, Annual Report," Bureau of.

I j23/2: draft james river comprehensive report I j57 the bureau of reclamation jobs corps program since garrison diversion unit I p58/14 pick-sloan Missouri basin program east bench unit I p58/15 pick-sloan Missouri basin program keyhole unit p58/21 pick-sloan Missouri basin program james diversion dam, oahe.

This enormous irrigation project, the Garrison Diversion Unit, was originally authorized by Congress in at a projected cost of $ million (or $ million in dollars). For this reason, Garrison Diversion and the Lake Agassiz Water Authority are moving forward with the Red River Valley Water Supply Project (RRVWSP).

The project will use a buried pipeline to convey treated Missouri River water from the Missouri River near Washburn, ND, along Highway to the Sheyenne River to be used by water systems in the.Garrison Diversion Unit, Missouri River Basin Project, Public Lawas amended; Energy and Water Development Appropriation Act ofPublic Law ; Garrison Diversion Unit Reformulation Act ofPublic Law ; Dakota Water Resources Act ofPublic Law Range of Approval/Disapproval Time.

None. Appeals. None.Construction of a ,acre Garrison Diversion Unit was authorized by Congress in as the initial stage of the plan. The authorization designa acres to be irrigated in the Oakes area.

The Missouri River water would be delivered via canals and the James River. Because.